At left, you can see the entrance to the new special needs restroom (left) as insulation was installed in the walls on Sept. 14. The other open doorway is the entrance to The Mai-Kai staff offices, featuring the vintage slate tile that was uncovered during the restoration. (Photo by Hurricane Hayward)